Deep foundation construction
Review material selection for deep excavations and diaphragm walls.
Provide retaining structure, excavation depth, trench or bore dimensions, strata, water level and schedule. Review trench stability, slurry circulation, joints and waste slurry handling. Confirm specifications and trials against project design and site conditions.
Solutions
Sand Strata Construction Solution
A full material and process package from mix design to loss control, holding surface settlement under 3 mm in water-rich sand.
Pebble Strata Construction Solution
High-carry mix designs and hole-control measures for the large cuttings and unstable walls of pebble strata.
Waste-Slurry Environmental Treatment Plan
A complete flow from mud-pond purification to solid-liquid separation, returning clear water to use and leaving a dry cake.