Solutions · Waste slurry

Waste-Slurry Environmental Treatment Plan

A complete flow from mud-pond purification to solid-liquid separation, returning clear water to use and leaving a dry cake.

Solution overview

Application methods
旋挖灌注桩施工 / 深基础施工 / 非开挖管线施工
Problem type
Waste slurry

Scenario and construction challenges

Shield and pile works generate large waste-slurry volumes: costly haul-away and environmental pressure make on-site separation and water reuse essential.

Challenge 1High haul-away cost

Large volumes at high disposal unit rates eat into project cost and schedule.

Challenge 2Hard to flocculate

Fine particles soak up chemicals, so ordinary flocculants need big doses with unstable results.

Challenge 3Reuse concerns

Supernatant quality fluctuates and must be verified before reuse in make-up.


Complete solution

Each scheme pairs materials with dosing; the table below lists material, role and ratio per step.

StageMaterialFunctionRatio / dosageWorking conditionScope
PurifyPAM-POOLPond pre-settling50–100 g/m³Waste slurry at 5%–15% solidsMud-pond pre-settling
FlocculateFLOC-PSolid-liquid separation20–50 g/m³pH 6–9 with high suspended solidsShield / pile waste-slurry separation
pH adjustNAOH caustic sodaNeutralise to specTo effluent specEffluent pH <6Neutralise to pH 6–9
DewaterFilter press / centrifugeDry cake for haul-away—Stacking area and dewatering plant availableDry cake for haul-away
iWorking conditions and scope in the reference mix table are typical values; actual dosages must be confirmed by on-site trials with raw water, soil samples and project design, and do not constitute a performance commitment.

Delivered results

35‰
Max salinity handled
-60%
Waste hauled away
6–9
Treated effluent pH
✓The figures above are measured data from this project (indicative). Actual performance varies with strata and working conditions; a full case report is provided together with the delivered solution.

Construction schematic & site photos

Use the schematic and site photos to follow the process and slurry flow; final parameters follow on-site trial results.

Construction schematic

① Waste-slurry collection ② Pond pre-settling ③ Flocculation & separation ④ Clear-water reuse and dry cake

Site photos

Mud pond and treatment area
Rotary drilling work area

Related cases

iContent is being prepared — contact us if you need it now.
GET A QUOTE

Tell us your strata conditions —
get tailored selection advice

Share your strata, borehole diameter and schedule; engineers will reply with mix advice, quantity estimates and lead time. Your information is used only for this enquiry.

✓On-site strata compatibility assessment (per project arrangement)
✓Batch test report & certificate with every shipment
✓On-site mix commissioning by our engineers (per project arrangement)
✓Samples and product brochures on request
Sales hotline
Business email
Form mode
For a quick conversation, leave your name, phone and a short message. Choose detailed project requirements if you have strata, borehole diameter or schedule data.
Filled in from the entry point you used; you can change it
Additional strata (multiple choices)
We will contact you to discuss your requirements.