Pebble Strata Construction Solution

High-carry mix designs and hole-control measures for the large cuttings and unstable walls of pebble strata.

Solution overview

Application methods
旋挖灌注桩施工 / 深基础施工
Problem type
Strata

Scenario and construction challenges

Drilling in pebble and boulder strata: large cuttings and loose walls demand higher carry and wall protection while controlling diameter and sediment.

Challenge 1Heavy sediment

Large pebble cuttings settle fast, adding clean-out work and risking pile quality.

Challenge 2Collapse risk

Loose pebble walls cannot stand unsupported — any delay in protection brings collapse.

Challenge 3Overbreak

A weak protective layer leads to oversize holes and concrete overpour.


Complete solution

Each scheme pairs materials with dosing; the table below lists material, role and ratio per step.

StageMaterialFunctionRatio / dosageWorking conditionScope
Make-upPAM-P for pebbleHigh-carry main material1:250Pebble / boulder beds, max size ≤800 mmΦ800–1500 pile bores
Base slurryBENT-N sodium bentoniteBase make-up6%–8%Fresh-water make-upBase slurry for high-carry systems
ThickeningCMC-NRaises yield point0.3%Thick bottom sediment, low yield pointPebble-stratum circulation slurry
MaintainPAM-P top-upRe-viscosify by returnsAs requiredRising cuttings load, falling viscosityDosed from return-slurry tests
iWorking conditions and scope in the reference mix table are typical values; actual dosages must be confirmed by on-site trials with raw water, soil samples and project design, and do not constitute a performance commitment.

Delivered results

100%
Hole acceptance
-40%
Waste slurry generated
22%
Faster pile drilling
≤2
Clean-out passes
✓The figures above are measured data from this project (indicative). Actual performance varies with strata and working conditions; a full case report is provided together with the delivered solution.

Construction schematic & site photos

Use the schematic and site photos to follow the process and slurry flow; final parameters follow on-site trial results.

Construction schematic

① Rig set-up ② High-carry slurry circulation ③ Fast cuttings return ④ Pond purification & separation

Site photos

Main-pier pile site
Pebble cuttings sample

Related cases

GET A QUOTE

Tell us your strata conditions —
get tailored selection advice

Share your strata, borehole diameter and schedule; engineers will reply with mix advice, quantity estimates and lead time. Your information is used only for this enquiry.

✓On-site strata compatibility assessment (per project arrangement)
✓Batch test report & certificate with every shipment
✓On-site mix commissioning by our engineers (per project arrangement)
✓Samples and product brochures on request
Sales hotline
Business email
Form mode
For a quick conversation, leave your name, phone and a short message. Choose detailed project requirements if you have strata, borehole diameter or schedule data.
Filled in from the entry point you used; you can change it
Additional strata (multiple choices)
We will contact you to discuss your requirements.