Solutions · Strata

Sand Strata Construction Solution

A full material and process package from mix design to loss control, holding surface settlement under 3 mm in water-rich sand.

Solution overview

Application methods
旋挖灌注桩施工 / 深基础施工 / 非开挖管线施工
Problem type
Strata

Scenario and construction challenges

Shield tunnelling and piled foundations in water-rich fine silty sand: high permeability causes severe slurry loss, so film-forming speed and settlement control must go hand in hand.

Challenge 1Heavy loss

High porosity in water-rich sand makes ordinary bentonite slurry lose heavily, driving up material consumption.

Challenge 2Slow film forming

Slurry that cannot film the wall quickly leaves poor protection and risks collapse.

Challenge 3Settlement sensitive

Tight surface settlement limits demand a stable pressure balance in the hole.


Complete solution

Each scheme pairs materials with dosing; the table below lists material, role and ratio per step.

StageMaterialFunctionRatio / dosageWorking conditionScope
Make-upPAM-S for sandFilm-forming main material1:400Water-rich fine sand, k = 10⁻³–10⁻² cm/sFilm-forming protection for rotary / shield bores
Concentrated sectionPAM-S concentrated slurryReinforced wall through crossing1:250Crossing sections with loss >5 L/minCross passages and pipe-jacking crossings
Base slurryBENT-N sodium bentoniteBase make-up8%–10%Fresh-water make-up, 5–35 °CBase slurry used with PAM-S
Viscosity tuneCMC-N viscosifierCuttings carry & viscosity0.3%Return slurry losing viscosity or carrySand-stratum circulation maintenance
iWorking conditions and scope in the reference mix table are typical values; actual dosages must be confirmed by on-site trials with raw water, soil samples and project design, and do not constitute a performance commitment.

Delivered results

3mm
Surface settlement control
<2 L/min
Slurry loss
6 days
Ahead of schedule to breakthrough
25%
Material consumption cut
✓The figures above are measured data from this project (indicative). Actual performance varies with strata and working conditions; a full case report is provided together with the delivered solution.

Construction schematic & site photos

Use the schematic and site photos to follow the process and slurry flow; final parameters follow on-site trial results.

Construction schematic

① Rig set-up ② Slurry circulation & wall protection ③ Cuttings return with slurry ④ Slurry purification & reuse

Site photos

Cross-passage portal
On-site mix verification
Settlement monitoring point

Related cases

GET A QUOTE

Tell us your strata conditions —
get tailored selection advice

Share your strata, borehole diameter and schedule; engineers will reply with mix advice, quantity estimates and lead time. Your information is used only for this enquiry.

✓On-site strata compatibility assessment (per project arrangement)
✓Batch test report & certificate with every shipment
✓On-site mix commissioning by our engineers (per project arrangement)
✓Samples and product brochures on request
Sales hotline
Business email
Form mode
For a quick conversation, leave your name, phone and a short message. Choose detailed project requirements if you have strata, borehole diameter or schedule data.
Filled in from the entry point you used; you can change it
Additional strata (multiple choices)
We will contact you to discuss your requirements.