South · Industrial plants

Hot-humid, saline-groundwater piles in South China: 72 h stable

A coastal plant foundation in South China hit 35‰ saline groundwater and hot, humid weather. The slurry flocculated out within 4 hours, forcing three slurry changes per shift with heavy idle time.

Project overview

Region
South
Project type
Industrial plants
Project scale
Coastal industrial plant piles in 35‰ saline groundwater and hot, humid conditions

Construction challenges

The main construction challenges encountered on this project.

Challenge 1Salt degradation

35‰ groundwater broke the polymer — slurry flocculated out within 4 hours.

Challenge 2Heat loss

Hot, humid conditions stretched exposure, accelerating fluid loss and destabilising levels.

Challenge 3Wavering indices

Salt plus heat swung slurry readings, undermining consistent holes.


Solution & materials

Materials and mix ratios used step by step on this project, for reference by similar works.

StageMaterialFunctionRatio / dosage
Base slurryBENT-NSalt-tolerant base6%–8%
Salt resistanceHDS-9 SeaShieldAnti-degradation0.5%–0.8%
RheologyCMC-NViscosify & control loss0.3%–0.5%
MaintainCompound top-upTune per shift testsAs required

Implementation notes

Adding HDS-9 SeaShield and CMC-N kept circulation stable through the salt and heat: viscosity and fluid loss stayed in spec for 72 straight hours, slurry changes fell to one fifth of the previous rate, and every pile passed inspection first time.


Delivered results

72h
Stable circulation
1/5
Slurry change frequency
How results were verified72-hour slurry circulation monitoring and per-shift replacement logs


Related products

GET A QUOTE

Tell us your strata conditions —
get tailored selection advice

Share your strata, borehole diameter and schedule; engineers will reply with mix advice, quantity estimates and lead time. Your information is used only for this enquiry.

✓On-site strata compatibility assessment (per project arrangement)
✓Batch test report & certificate with every shipment
✓On-site mix commissioning by our engineers (per project arrangement)
✓Samples and product brochures on request
Sales hotline
Business email
Form mode
For a quick conversation, leave your name, phone and a short message. Choose detailed project requirements if you have strata, borehole diameter or schedule data.
Filled in from the entry point you used; you can change it
Additional strata (multiple choices)
We will contact you to discuss your requirements.